So, here’s something I didn’t know when I decided to gut-renovate a house.  It takes almost an entire calendar year to finish partial demolition and masonry work.  We started in October 2016, and as of the time of this writing, we are getting ready to start the framing of the house in October 2017!

What took so long?  Well, if you’ve been following my blog, the town was very difficult to deal with at first, and then I’ve been mired in construction delays.  At times, I’ve wondered if I make a mistake by not completely demolishing the house.  I probably could have gained efficiency if the old structure wasn’t in place and then we would have had enough room to bring machinery in to assist in the excavation process.  It’s hard to tell exactly what the cost and time difference would have been had I done that, but we did get to save most of the original structure, so that should be worth something.

We Have a Drainage System

In June, we dug a trench where the old clay pipe drainage system used to be.  Apparently, the sewer connection is somewhere behind the house, not in front of it.  We were able to locate the connection, and hook the new PVC pipe system into it.

IMG_7421.JPG

The drainage system in the front driveway

Once the new drainage system was built, we had to call in the town to inspect before we could cover it back up and fill it in.  It took about 4 days lead time to call the inspector in.  He failed us due to the way the pipes were configured, I never got the exact detail why.  The plumber had to fix the problem and we had to get the inspector back in seven days.

IMG_7428.JPG

All of the sewage connections in the house come together in the garage

Just like that, an entire week was lost.  This may not seem like a big deal, but this is typical of a project.  A three-day setback here, a week setback there, a three-week setback for some reason.  It all adds up to major, major time lapses in between actual work.  I’ve come to learn that watching your construction project sit idle for any amount of time is a special kind of torture that I wouldn’t wish on anyone.

Let’s Button It Up

After we finally passed the inspection of the drainage system, we were able to build the basement floor.  We backfilled the dirt over the pipes and filled in the trenches.  We put a plastic sheet down over the dirt and then built a rebar mesh on top of that.  That required yet another inspection, one which we passed on the first try.

IMG_7761.JPG

The drainage trough at the foot of the driveway

IMG_7763.JPG

The plastic membrane and rebar

IMG_7767.JPG

The plastic membrane and rebar

It took a few weeks for the mason to come back, of course, but when he did, he poured concrete over the rebar and plastic, and I finally had a finished basement floor!

IMG_8268.JPG

View of the fresh coat of cement from the driveway

IMG_8271.JPG

The fresh cement in the rear addition of the house

More Demolition

Once the floor was poured, my general contractor called in the framer so he could get ready to get started.  They also called in my architect to walk through the plans together and get on the same page.  One of the things they reviewed was the remaining demolition work that needed to be done.  The house needs to be demolished in stages so the remaining shell can stay in place without collapsing during construction.

IMG_8590.JPG

Making a big mess out front

For reasons that weren’t too clear to me, we still hadn’t done a lot of the work that the framer required in order to start.  It could have been done while we had some downtime in between inspections, but it didn’t happen.

Somebody noticed that there was concrete between the garage and first floor that had to be demolished.  I don’t know why we didn’t learn this sooner.  So, they had to put plywood down on my brand-new garage floor and demolished the concrete, making a mess of the basement again.

IMG_8592.JPG

This is now on top of my new basement floor!  AAAAAHHHHH!!!!!

They had to demolish the original brick chimney while they were at it.  That was another bit of work that could have been done much earlier.  Finally, they had to strip the outside and inside of the house to the studs and plywood.  When it was all done and cleared out, there wasn’t much left but the outer shell of the house, and the ceiling and floor between the first and second floors.  The house was finally in a condition to be framed.

IMG_8593.JPG

What’s left of the chimney

IMG_8594.JPG

The spaces in between the joists were where the cement was between the first floor and the basement.  Nobody noticed it was here until we had finished the basement floor.  It had to be removed because it was potentially damaging to the joists.

IMG_8597.JPG

The hole to the sky where the chimney used to be

IMG_8923.JPG

What is now left of the front of the house. The garage door is gone, replaced temporarily with that blue tarp.

IMG_8935.JPG

All that is left of the second floor.  Only the outer shell and the roof will remain.  The floor will be completely ripped out.

OK, So Let’s Get Started

In late August, my GC e-mailed me to tell me the framer was going to start on September 20.  We had a week or so of demolition left and the house would be ready to go long before the start date.  Naturally, I called him right away to tell him we needed to move that date in.  He told me it wouldn’t be possible because the framing guy was working another job.  I told him that I really needed the house to be framed before the winter set in.  He emphatically stated that it would take at most two weeks to frame the house and I didn’t have anything to worry about.

September 20 approached and the GC told me the start date was now going to be September 21.  Then the framer declared that because it was a Thursday so we might as well start the next Monday.  I didn’t follow that logic at all, but I wasn’t going to flip out about four more days wait.

On Monday, I texted the GC and asked him if we were starting.  Heard nothing back that day.  On Tuesday he texted me and said he was aware I was waiting for an answer and I’d hear back from him by the end of the day.  No word for the rest of the day or all of Wednesday.  Thursday, I called and got him on the phone.  He told me he was very embarrassed, but the framer wasn’t going to take the job.

Things took an interesting turn after that.  I repeated my original deadline that the house had to be framed before the winter or the project would be in serious jeopardy.  I would at some point just run out of money, having to pay two mortgages.  I’m already well over 10 months past my projected worst-case scenario of being done from when I bought the house in December, 2015.

My GC proceeded to get very worked up in explaining to me that he’d figure something out.  He said he was embarrassed and upset about the situation and he felt that his entire reputation was on the line.  I ended up having to calm him down and tell him not to get bent out of shape.  It was almost as if our positions were juxtaposed.  I should be the one that is bent out of shape!

I started to consider my options in order of preference:

  1. Wait for my GC to find a new framer
  2. Find my own framer
  3. Fire the GC and quickly find someone else
  4. Stop making mortgage payments and let the bank foreclose on the house

Each option had pros and cons.  At that point, as much as I like the guy, my confidence in my GC was pretty much shot.  I didn’t have a framer or a new GC in mind and it would be difficult to make a big change like that given my time constraints at work.  The fourth option was a nuclear one, but it’s not as bad as it sounds.  I’d lose about 15 years of savings with everything I’ve put into the project so far and my credit would be ruined.  But I’d stop the bleeding.  I wouldn’t need my credit rating anymore because it would be years before I could save up enough to try again.

Anyway, on Friday, I got a series of text messages from the GC that he had found a new guy and that he might be able to start next week.  They met at the house that day, and by Saturday, we had a quote from him.  After a day of pondering my options, the first one looks like it was going to work out.

I have it in writing that it should take the new framer about three weeks to finish, and that includes installing the windows that I ordered in August.  The framer has a job he needs to start right after that, so he is incentivized to hurry up!

In a way, this is almost too good to believe that we found a reputable guy just in time that has nothing else better to do for the next three weeks.  But, this is pretty much my best choice right now.  So, on Monday, we are going to order $16,000 worth of lumber from Kuiken Brothers, and we are going to get started.

How Did It Come to This?

When I started this blog, I had figured that it would be an interesting story about design decisions, construction, and decorating the house over the course of many years.  I thought I would be living in the house by the end of 2016, and would have sold my Hoboken condo, rolling the proceeds from the sale into a much smaller mortgage on the new house.  Instead, this blog has turned into an infrequent, long-winded complaint about not much getting done!

I don’t live life with regrets.  I believe in taking measured risks in order to get better outcomes for yourself.  This was definitely a risk, and so far, it has not worked out at all.  I am certainly not going to say I regret this decision, I know that I wouldn’t have been happy had I simply stayed in my small Hoboken apartment with no eye towards the future.  But, this certainly now falls into the category of a BAD IDEA!  I’m never going to make up all the money I lost paying the double mortgage for so long, and as of this writing, I can’t see how it’s even going to get done before 2019, a full three years and more after I bought the place.

This is a pivotal week.  If they start framing the house and come even close to their self-imposed three-week deadline for completion, my whole outlook will change.  I’ll be in a position to tell my contractor that he’d better have someone working on this job every single day until it is done!  All work can proceed on the house once the framing is complete, and weather will no longer be an issue.

Wish me luck…

Is Your House Done Yet?

“Hey man, how’s your house?  You moved in yet?  I haven’t seen one of your blog posts in a while”.

This line of questioning is all my fault.  I’m the one that told everybody I knew that I bought a house in December, 2015 and planned to renovate it.  I made matters worse by blogging about and sharing it on Facebook.  I drew all kinds of attention to the subject so I deserve the litany of questions that go along with it.

The only problem is that I have had virtually no answer to that question for the better part of 2017.  This past winter was brutal for my project.  We started in October of 2016 and hit a number of roadblocks right away.  Not much can progress on the house until the masonry in front and back is complete.  Only when that is done can the house be framed and the rest of the work can start.

There is a whole litany of reasons the project moved so slowly, fitting mainly into three categories: Difficulty with inspections from the town, bad weather, and delays with the mason.  Weeks would go by with no progress at all, leaving me with an empty feeling of helplessness as my bank account was draining with nothing to show for it.

In January, there was some progress on the rear addition.  The footings were approved and the mason started to lay cinder blocks with a duro-bond wire in between every other layer.  Once that was done, my contractor called the building inspector and asked him to approve the rear addition.  On February 3, the inspector gave us our first inspection failure.

Failure.png

My first inspection failure.  I think I’ll frame the original.

The basis of the failure was somewhat unclear at the time.  It seemed to hinge on a somewhat confusing conversation that the inspector and my contractor had.  First, the inspector said that we needed to check to make sure the foundation was built with the proper setbacks from the neighboring properties in accordance with the approved plans.  The contractor asked if that meant we had to have the property surveyed right away.  The inspector said that would do, or we could get a letter from my architect saying that we were building according to his design.

The second reason we failed was because the inspector wanted proof that we put the duro-bond where it belonged and that we doweled into the existing wall properly.  My contractor said that we had pictures and that the architect was supervising the project and could attest that we were in accordance with the building code.  The contractor pointed out that the only to prove everything would have been to have the inspector visit after every layer of cinder block was installed!

IMG_6189.JPG

I’m telling you, bro, we really did layer the blocks properly!

IMG_6218.JPG

It was kind of hard to prove once the walls were built.

IMG_6305.JPG

The view from the back looking towards the front of the house

We proceeded to get a letter from the architect explaining that everything was built according to plan and we sent that to the building inspectors office.  We really didn’t know at the time if that was going to be good enough, so we prepared to move on with building the drainage system.

The project had stalled a bit being early February.  The weather was poor and the mason didn’t have much of a window to work outside.  My contractor told me that he was going to meet with the mason on February 20 to discuss moving forward with the project.  I asked if he could let me know what time he was going to be there so I could meet them both.  I had that day off of work for President’s Day.

On the morning of the scheduled meeting, my contractor texted me and asked me to give him a call.  He said that the contractor was on an unannounced two-week vacation to Peru.  Of course, the weather broke and those two weeks were very temperate for that time of year, it would have been good enough for the masonry crew to continue on.

About three weeks after the supposed two-week vacation started, the mason announced he was going to return to the job.  That day it snowed and he couldn’t come.  The snow was heavy and froze over and set us back again.  All told, from the time of the failed inspection on February 3, we lost about 8 weeks to weather and the mason’s vacation before he was able to start back on the project in earnest.

The Drainage System

As I explained in a previous blog post, we had to build a pretty elaborate drainage system around the extension in back of the house.  We were required to drain all rain water into the sewer connection.  This is the opposite of what most municipalities want you to do, typically you are not supposed to overload the sewer system with rain water.  Union City works in mysterious ways.

We also had to fill in the trenches around the extension with rocks to aid in drainage around the outside of the house.  Since we couldn’t get machinery through the alley between my house and the neighbor, the masonry crew had to use shovels and a wheelbarrow to fill the rocks in around the house.

IMG_6299.JPG

That trench is where the rainwater drainpipe will be.

IMG_6438.JPG

One of the rainwater drainpipes in it’s fancy rocky bedding.

IMG_6444.JPG

An idea of the scale of the excavation we had to do to make room for the pipe.  The masons made this pile of dirt with buckets, one by one.

IMG_6450.JPG

The pipes in the aforementioned trench.

Front Masonry

The front of the house wasn’t nearly as elaborate as the job in the backyard.  We aren’t extending the house in the front, but we are building a second story where the original mud room front porch was.  This required first that we demolish the mud room and check the existing foundation to see if the footings were deep enough.  On the left side of the house, the footing was deep enough to pass inspection.  On the right of the house, there was no footing at all, requiring us to demolish the existing wall and excavate enough ground to pour one.

IMG_6457.JPG

Nope, no footing in here.  WTH?

IMG_6681.JPG

So, we just poured our own footing.  Better make sure it is 42″ deep, not just 36″. Don’t want the house to fall over!!!

IMG_7017.JPG

And we have a new wall in front.

The dangerous front steps were also slated for replacement.  They were demolished and the skeleton of the new steps were put in place.  They seem to be a lot more even and less deadly than the old set of steps.  They still need to be finished with concrete.  We’re not going to use any brick finishes, the design we are looking for is a simple one with a skim coat of stucco.

IMG_6431.JPG

The hole where the old steps used to be.

IMG_7045.JPG

The foundation of the new steps, all with uniform height!

The Inspector Is Our Friend Now?

Before we could backfill the backyard, we needed to have the inspector come and check out the drainage system.  We also wanted him to review the front footings, the existing one we planned to retain, and the new one that we dug out.  He no-showed our first window, telling my contractor while he was at the house waiting that he couldn’t make it.  He made it the next day, and things went decidedly better than any of our previous inspections.

The inspector reviewed the drainage system in back and determined that it was adequate.  He gave us the go ahead to back-fill the dirt back in the trenches without issue.  There was, however a problem in the front.  The new footing was only 36 inches deep, according to the plans and building code, it had to be 42 inches deep.  The contractor realized there was a mistake but was taken aback by the response the inspector had.  He told the contractor simply to dig the hole six inches deeper, send him a picture, and that we’d be good!  From the explanation of the story that I got, I think my contractor nearly fainted from the shock of this act of kindness and common sense. This was the go-ahead we needed to build the new foundation wall on the right side of the house which was the last bit of foundation that needed to be built.

IMG_7061.JPG

The backyard now that the trenches have been back-filled.

So, Where Exactly Does the Sewer Drain?

Now it was time to hook into the existing sewer connection as per our design.  The mason ripped up the basement garage floor where the house trap is.  We found a clay pipe that we originally thought drained out the front of the house to the sewer in the street.  The plumber visited and pointed out that the pipe was pitched towards the back of the house.

IMG_7064.JPG

The clay pipe, pitched down and away from the front of the house.

It turned out that the clay pipe was just a rainwater drain from the front of the basement and that the sewer pipe heads out the back of the house.  We couldn’t figure out exactly which direction it heads.  When we excavated the back extension, we never hit the pipe.  It either took a sharp turn to the side under one of the neighbor’s houses, or went straight down.  Whatever the case is, they tested it out with a hose and water seems to drain well through it, so who cares?

Hopefully this is the last “mystery” in this house.  There’s going to be so little left of the original house that there shouldn’t be much guesswork with the rest of what we have to build since most of it will be from scratch.

The mason took out the existing machinery from the basement (none of which was working anyway) and excavated all the spots where we will run the drainpipes from upstairs.  He also ripped out the clay pipe, we’re going to replace that with PVC piping.  When it’s all done, there is going to be very little left of the original basement floor and I’ll have a nice new coat of concrete.

IMG_7364.JPG

The remnants of the machine room, along with a trench for drainage.

What’s Next?

We started masonry work in October, 2016.  As of mid-June 2017, we are almost done.  I thought the entire house would take about that long to build, so feel free to call me a dumbass the next time you see me.  Anyway, we can’t move forward with anything else until that is done.

All that is left is for the plumber to hook up all the drains from the inside and outside into the sewer connection.  We will then ask for another inspection.  If we should be lucky enough to pass, they can backfill the dirt in the basement.  We will finally be able to start the framing process.

I met with the framer two weeks ago with my GC to over the project.  When my contractor originally explained the process to me, he said that framing would take “one week, two max”.  I asked the framer what his opinion was and he said it would take “three to four weeks”.  So, I’m guessing it will take three months.  If I’m lucky, he’ll be done by mid-October, but that’s only if I’m lucky, which I’m obviously not.

Is Your House Done Yet?

So, back to that original question.  No, it’s not done, but now I think I have a better idea of where we are at.  Once framing is done, everything else can get started, some of which can be done in parallel.  There also won’t be weather delays for anything on the inside.  We can put siding up, install windows, rough the electric and plumbing, put drywall and flooring in, and install the kitchen and bathroom fixtures and finishes.  Piece of cake, right!

As you may recall, I closed on the house in December, 2015.  I thought we’d have permits in a month or two, start building in March 2016, and be done in time for me to move in before New Year’s 2017.  Given the pace we are at, and how long just the masonry phase has taken, I have a better idea of my estimated completion date.  I think my best-case scenario at this point is December, 2018.  That would be a full three years from when I bought the house.

This situation puts me in serious financial jeopardy.  I budgeted for a year of paying two mortgages out of my savings, not three.  Additionally, the bank I work for had to pay a $7.2 billion fine to the US Department of Justice in January as a result of some improprieties from 2005-2007.  They had to cancel our bonus pool entirely, which was a nice kick in the gut on top of everything else.  The assholes that broke the law are all gone from the bank, playing golf and spending the summer in their Hamptons mansions.  Now I have to figure out how to make up that cash that I was desperately counting on coming in this year.

I’m not sure what’s going to happen other than I have to move forward.  I can’t sell the place as-is, it is a shell right now. I can borrow against my current apartment in Hoboken which is the likely course of action.  However, the plan all along was to sell my condo at the end and use the proceeds to refinance the jumbo mortgage I took out on the new house.  Anything I borrow against my condo eats into the profit I will make when I sell, giving me less money to pay down the principal on the new mortgage, increasing what I’d have to borrow.

I can hope for the best, but there is a slim possibility that I will have to turn around and sell the new place immediately when it is finished.  If that happens, some lucky person is going to get his or her hands on the best house in all of Union City.

I walked through the house yesterday, the entire property is a complete disaster.  The backyard is a muddy mess, there are trenches in the basement, and the frame of the existing house is partially demolished and littered with debris.  It was a “what was I thinking?” moment.  But I regret nothing, I knew I was taking a risk and had bitten off more than I could chew.  If I pull this off, I will be living in my dream house someday.

IMG_7363.JPG

Just a crazy mess right now.

IMG_7374.JPG

What’s left of the insides, the flooring was removed.

IMG_7378.JPG

The clay pipe is gone, leaving this disaster of a trench inside the basement.

There’s a sliver lining to this dark cloud.  Count on partying at my place in Hoboken on the first Saturday of March, 2018!  It’ll be cramped as usual, but we always manage to fit somehow.